What it produces
An approved G702 and G703 per contract, submitted in the payer's portal (Textura, GCPay, Procore, an owner portal or email), with confirmation saved and payment tracked.
the monthly request a contractor submits to the owner for payment on work completed, usually on AIA G702 and G703 forms
An approved G702 and G703 per contract, submitted in the payer's portal (Textura, GCPay, Procore, an owner portal or email), with confirmation saved and payment tracked.
The billing lead and project accountant, with the PM certifying percent complete and an authorized officer signing.
Monthly per contract, with retention billing when the job reaches substantial completion.
Every GC runs its own portal, cutoff and budget layout, so the billing lead keys the same numbers twice. The portal computes retention its own way, and a one-cent rounding difference per line stops the draw. A change order approved in your ERP is missing from the GC's budget. A return for revision lands after the cutoff, and the bill slips a whole month.
The ERP, Textura, GCPay, Procore, owner portals, Outlook, Excel percent-complete workbooks, SharePoint, banking portals and e-signature and notary tools.
Where a payer accepts an integrated feed, use it. The agent covers the gap: twelve GCs means twelve portals, and none of them reads your ERP.
12 steps · 6 actions · 4 decisions · 2 human reviews
Action Decision Human review Select a step in the flowchart to jump to it.
Action · ERP
On the billing date, pull the schedule of values, approved change orders, billed to date and retainage from the ERP.
Action · Agent
Collect the PM's percent complete or installed quantities per line.
Decision · Agent
No line past 100 percent, stored materials only with backup, change orders only when approved on both sides, retainage capped by the state's limit.
Action · Agent
Generate the G702 and G703.
Human review · PM
The PM and billing lead approve. Large billings go to the controller.
Decision · Agent
Route by payer from the contract table.
Action · Agent
Open the draw in the billing lead's own browser session and enter each line.
Decision · Portal
Read back the portal's completed to date, retention and net amount. Each must equal the approved figure to the cent, or the step holds.
Action · Agent
Attach backup, conditional waiver and certified payroll where required.
Human review · The authorized
The authorized signer signs, with a notary where the payer requires one.
Action · ERP
Submit, save the confirmation page and stamp the date on the ERP invoice.
Decision · Agent
Check status daily. Returns go to the PM with comments; short payments are classified by rule or routed to the PM.
✓ Done
The run pauses for the named user; codes are never stored.
The draw holds with both figures shown.
The PM sees it before anything is entered.
Held off this draw and flagged.
Escalated to the controller the day before.
Signing waits until it is corrected.
A draw that went in on time and matches your ERP to the cent, a confirmation page with a timestamp, screenshots of every field entered, and a clear reason for every dollar the payer approved short. Timing disputes are settled by the record. Product →
No. It prepares everything to the signature line and stops.
Lines map through a table you approve once per contract. A renamed line stops the run for the PM.
Any portal your billing lead uses in a browser, in that person's own session.
When the contract says it is due, usually after substantial completion is accepted. The agent watches for that date and drafts the retention bill for approval. Lien Waivers →