What comes in
- Material requirement and production need dates
- Open purchase lines and supplier responses
- Approved item, revision and escalation rules
LaunchAI connects material requirements, supplier commitments and purchasing records so the buyer’s queue reflects the production need.
The job in one minute
Manufacturing procurement coordinates material demand, supplier commitments and purchasing decisions so production has the required inputs. LaunchAI can perform the recurring work across ERP screens, supplier messages and documents. Planning remains with the planning system; buyers and technical owners define how exceptions are resolved.
A demand-linked buyer worklist with supporting supplier and specification evidence.
The buyer and the responsible team keep commercial, qualification and financial authority. The agent does the permitted work and brings exceptions to their owner.
See it run
In this conceptual walkthrough, an AI agent picks up planner02's request to cover the bought-out parts for job J-24117 (HPU-30 rev D, qty 4, material need-by 11/18/2026) and the overnight MRP notice. In Epicor Kinetic-style screens it confirms the job's three Buy lines, filters the PO suggestions S-9031 to S-9033 (due 11/16, two days before need-by) and checks supply: existing stock and open POs are pegged to other jobs, so all three are truly short 4 EA. Supplier V-1180 is approved, but the pump's 389.00 price expired 10/31, so under PUR-02 the agent asks the supplier for a current price and delivery. Quote BW-Q-3391 prices the pump at 412.00 (+5.91%), over the PUR-07 3.00% limit, so buyer01 approves it. The agent enters PO lines for the pump and reservoir from their sources, raises a planner exception because the motor's confirmed 11/25 misses 11/18, saves PO 5127 (2,506.00) for buyer01's approval, verifies it by reopening, and reports the open motor shortage to buyer01 and planner02.
Conceptual walkthrough with sample data. Screens are generic stand-ins modeled on the named system, not its own interface; workflow and screens vary by ERP.
At the buyer’s desk
The high-value order is not needed for weeks. A low-cost fastener is holding up final assembly. A list sorted by purchase value cannot show the buyer what matters first without the production requirement beside it.
The purchasing queue rarely matches the production queue perfectly. A small late component can stop a high-value assembly while a large, noncritical order attracts more attention. Buyers need demand context and current supplier facts, not simply a list sorted by PO value.
How the agent does it
LaunchAI follows the purchasing task through your existing applications. Each step has a source to read, a rule to apply or an outcome to check.
Relate the material need to the production demand and required revision.
Check the latest acknowledgment, open balance and shipment information against the planning view.
Organize an RFQ, order draft, clarification or expedite request according to the buyer’s rules.
Enter permitted accepted facts, retain source evidence and route unresolved issues to planning, engineering or buying.
The detail that changes the job
A low-cost fastener is late for a final assembly while a higher-value casting is not needed for several weeks.
Move the divider to see how the starting information becomes a checked outcome. The complete fields are in the table below.
| Field | Starting information | Checked outcome |
|---|---|---|
| Priority | Sorted by purchase value | Production need included |
| Commitment | Requested dates only | Supplier promises checked |
| Action | Buyer investigates each line | Evidence-linked worklist prepared |
Worked example, not a customer result. Values and documents illustrate what to test.
Exact rules. Context. A person where needed.
The agent needs to recognize the point where the next action depends on missing information or another person’s authority.
Define the allowed fields and actions in your software. A draft, an external commitment and an approved payment are different steps.
Show the working
Agree on the baseline and the finish before the pilot. Count review and exception work as well as completed transactions.
Buyer queue items with demand references
Unconfirmed commitments feeding production
Time from exception detection to assigned action
The practical questions
No. MRP calculates requirements. The procurement workflow coordinates the records, supplier work and decisions that follow.
Choose a recurring task with clear inputs and ownership, such as PO draft preparation or confirmation comparison, and validate it with representative exceptions.
Your applications. Your purchasing rules.
We’ll scope the input, the saved output and the exception that needs your team.